Home » Posts tagged with » wind-energy

EcofinConcept supports private investor with the purchase of an existing Enercon wind turbine

EcofinConcept supports private investor with the purchase of an existing Enercon wind turbine

Share widget is not set up. Go to Admin » Appearance » Widgets » and move Gabfire Widget: Share Items widget into Archive-Share Widget Zone

The wind power plant with a nominal output of 800 kW, a hub height of 73 m and a rotor diameter of 53 m is located at a location near an autobahn in Lower Saxony and has been in operation since 2007. In accordance with the Renewable Energy Sources Act…

EcofinConcept: Successful completion of one of Germany‘s largest repowering projects

EcofinConcept: Successful completion of one of Germany‘s largest repowering projects

Share widget is not set up. Go to Admin » Appearance » Widgets » and move Gabfire Widget: Share Items widget into Archive-Share Widget Zone

Satisfied today, all parties look to the achieved. That was not always so. One of the largest wind farm repowering projects in Brandenburg, Germany, threatened several times to fail because of the complexity of the task. So not only numerous specialist authorities, but also hundreds of limited partners of the…

Fusion of Independent Service Providers: seebaWIND Service takes over Service4Wind

Fusion of Independent Service Providers: seebaWIND Service takes over Service4Wind

Share widget is not set up. Go to Admin » Appearance » Widgets » and move Gabfire Widget: Share Items widget into Archive-Share Widget Zone

Osnabruck, Germany 04.12.2014. seebaWIND Service GmbH will be taking over the business operations of its network partner Service4Wind as of 1 January 2015. The manufacturer-independent service provider will continue to employee all of Service4Wind’s employees in Osnabruck and Mücke. Thanks to the takeover, seebaWIND will look after around 50 additional…

seebaWIND Service Rebuilds Burned-down Wind Power Plant in Schleswig-Holstein

seebaWIND Service Rebuilds Burned-down Wind Power Plant in Schleswig-Holstein

Share widget is not set up. Go to Admin » Appearance » Widgets » and move Gabfire Widget: Share Items widget into Archive-Share Widget Zone

Osnabruck, Germany, 27 August 2014. The manufacturer-independent service provider seebaWIND Service has successfully repaired a badly damaged 1.5 megawatt wind power plant in the district of Schleswig-Flensburg and put it back in operation. For this challenging project, seebaWIND Service served as project manager, working with several manufacturers, appraisers and other…

WINDFORCE trade fair and conference draw to a successful close

WINDFORCE trade fair and conference draw to a successful close

Share widget is not set up. Go to Admin » Appearance » Widgets » and move Gabfire Widget: Share Items widget into Archive-Share Widget Zone

Optimistic closing mood despite difficult framework conditions…

Global partneship between Ammonit and ZephIR Lidar

Global partneship between Ammonit and ZephIR Lidar

Share widget is not set up. Go to Admin » Appearance » Widgets » and move Gabfire Widget: Share Items widget into Archive-Share Widget Zone

Ammonit partners with ZephIR Lidar as a ‘Trusted Service Provider’…

New Energy Husum starts the call for papers for the international small wind turbine congress

New Energy Husum starts the call for papers for the international small wind turbine congress

Share widget is not set up. Go to Admin » Appearance » Widgets » and move Gabfire Widget: Share Items widget into Archive-Share Widget Zone

New small wind turbine forum opens for the general public…

Pattern Energy Begins Construction on Windfarm in Texas Panhandle, an Industrial Info News Alert

Pattern Energy Begins Construction on Windfarm in Texas Panhandle, an Industrial Info News Alert

Share widget is not set up. Go to Admin » Appearance » Widgets » and move Gabfire Widget: Share Items widget into Archive-Share Widget Zone

SUGAR LAND, TX -- (Marketwired) -- 11/13/13 -- Researched by Industrial Info Resources (Sugar Land, Texas) -- (NASDAQ:PEGI) (San Francisco, California) recently began construction on a grassroot, 218-megawatt facility in the Panhandle region of northern Texas. The Panhandle Windfarm development has been divided into two phases.Other companies…

NaturEner Hosts Montana Governor Steve Bullock at its San Francisco Corporate Offices

NaturEner Hosts Montana Governor Steve Bullock at its San Francisco Corporate Offices

Share widget is not set up. Go to Admin » Appearance » Widgets » and move Gabfire Widget: Share Items widget into Archive-Share Widget Zone

Governor Bullock receives an update on NaturEner--s Montana wind energy facilities totaling 399 MW, and its plans for future development in the state…

NaturEner Hosts Montana Governor Steve Bullock at its San Francisco Corporate Offices

NaturEner Hosts Montana Governor Steve Bullock at its San Francisco Corporate Offices

Share widget is not set up. Go to Admin » Appearance » Widgets » and move Gabfire Widget: Share Items widget into Archive-Share Widget Zone

Governor Bullock receives an update on NaturEner--s Montana wind energy facilities totaling 399 MW, and its plans for future development in the state…

Page 1 of 7123Next ›Last »